Friday, January 11, 2008

Deck Posts












December 9, 2007 ~ After the footings had been poured and dried, the solid cedar logs that Rapid River sent down for the deck were placed on to the drift pins encased in the footings (9" rebar) and girder boards were centered on top of them.

No comments: