skip to main
|
skip to sidebar
The Forbes Log Home Building Adventure
Friday, January 11, 2008
Deck Posts
December 9, 2007 ~ After the footings had been poured and dried, the solid cedar logs that Rapid River sent down for the deck were placed on to the drift pins encased in the footings (9" rebar) and girder boards were centered on top of them.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Weather Outlook
Blog Archive
▼
2008
(60)
►
December
(4)
►
October
(5)
►
September
(4)
►
July
(12)
►
June
(3)
►
May
(12)
►
April
(4)
►
March
(6)
►
February
(5)
▼
January
(5)
First Floor Taking Shape
Log Structure Taking Shape
Invasion of the Foam Globs
Electricity!
Deck Posts
►
2007
(22)
►
December
(3)
►
November
(7)
►
October
(12)
Contributors
Ade and Cor
Adrian Forbes
No comments:
Post a Comment