Late November through Mid-December 2007 ~ After Ade and Bill installed the 200 Amp service box in the basement and the meter box on the outside corner of the house, I helped to bury and "daisy-chain" the ground rods with copper wiring around the front corner of the house. Our Electrical inspector for Grass Lake Township, Keith King, came for our first electrical inspection. We passed, so Consumer's Energy came out to finish their work of installing poles and power lines, as well as trenching ~135 feet of wire underground up to our house. To date, we've used a whopping 6 kilowatt hours (or 50 cents I'm guessing).
Friday, January 11, 2008
Electricity!
Late November through Mid-December 2007 ~ After Ade and Bill installed the 200 Amp service box in the basement and the meter box on the outside corner of the house, I helped to bury and "daisy-chain" the ground rods with copper wiring around the front corner of the house. Our Electrical inspector for Grass Lake Township, Keith King, came for our first electrical inspection. We passed, so Consumer's Energy came out to finish their work of installing poles and power lines, as well as trenching ~135 feet of wire underground up to our house. To date, we've used a whopping 6 kilowatt hours (or 50 cents I'm guessing).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment