Saturday, February 2, 2008
First Floor Stacked Logs Nearing Completion
Aside from the front window wall which needs the logs notched a certain way, most of the other walls have reached their 18 course stack heighth (this does not include the 3 courses of siding that will reside beneath course one to cover up the rim board and the deck/porch flashing). Here are some pictures after the snow we received on Friday 2-1-08.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment