Saturday, February 23, 2008
Second Floor Joists and Floor On!
The external structure is coming along nicely. Our building crew has made some great progress this month with the log stacking. As of Friday, the second floor joists, rim board and plywood floor sheathing have been installed. They are hopeful that by the end of next week (2/29), the crane/boom arm truck will be out to help set the ridge and valley glulam beams (Douglas Fir) for the roof.